• Oct
    29
    2014

    New hydropower system installed

    A new hydropower system at an old mill site in the South Pennines has been installed. The site uses 3 Powerspout Turgo turbines, using around 8 l/s each on 7 metres of head. Output (with 2 machines running) was around 860 Watts when I visited.

    The system was designed by Andrew Menzies of 350 Energy.

    More information.

Power From the Landscape

Alternative Technology Centre
Unit 7, Victoria Works
Victoria Rd
Hebden Bridge
HX7 8LN

Tel: 01422 842121

Contact Us

Hosted by Green Web Host

Designed and built by Losource